| Date: |
11-10-2007 |
|
| Number of Hours: |
5.50 |
|
| Brief Description: |
Roll over bar installation and aft fuselage riveti |
|
|
I started the day by completing the roll over bar installation. The F-732A channel was joined to the F-631 rollover bar at the foward end with three angles and the F-631 rollover bar was match drilled at the base to the F-631C and F-631D angles. Then my brother Bernie dropped in so we riveted the aft upper fusealge skin on. |
||