| Date: |
8-24-2007 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
F-717 longeron completed and match drilled |
|
|
Today I completed the fabrication of the F-717 longerons and match drilled them to the F-770 and F-772 side skins and bottom skins as well as the WD-603 firewall brackets. Then I fabricated the F-684 gussets and bent and match drilled the left gusset onto the firewall angle and F-713 auxilary longeron. |
||