Date:    8-23-2007
Number of Hours:    2.75
Brief Description:    F-719B angle clip completion, F719 installation...
Today I completed the fabrication of the F-719B angle clip, trimmed the F-719 longerons and installed and match drilled the two to the F-770 forward side skin, see image 1. Then I began the fabrication of the F-717 lower longeron, see image 2.