| Date: |
7-19-2007 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Cleaning, abrading, alodining, priming and rivetin |
|
|
I started the day by edge finishing the step flanges and preparing the steps for priming. Then I cleaned, abraded, alodined and primed the rudder pedals, rudder cable links, rudder stops, rudder pedal brace, control column mounts, elevator bellcrank and the F-665, F-790, F-789 pushrods. Once the primer was dry I riveted the rudder pedals, elevator bellcrank and pushrods. |
||