| Date: |
6-7-2007 |
|
| Number of Hours: |
4.75 |
|
| Brief Description: |
F-718 Longeron Bending, J channel trimming |
|
|
I started the day by completing the F-718 longeron bending procedure and match drilled the F-721B aft deck to the longeron, see image 1. Then I trimmed the six F-876 J-channels to length as per drawing 18. I finished up by starting to assemble the aft fuselage assembly, see image 2 and 3. |
||