| Date: |
6-6-2007 |
|
| Number of Hours: |
8.25 |
|
| Brief Description: |
F-707 to F-12 bulkhead preparation |
|
|
Today I prepared the F-707 to F-712 bulkheads by drilling snap bushing holes to size, adding pitot static line clamp attachment holes, fabricating bulkhead angles and bars as well as the tie down ring fitting. I then deburred and edge finished all the bulkheads. With bulkheads complete I turned to the preparation of the F-718 longeron. I cut the stock angle to length, cut the required notch at the aft ends and started the required bends as per the drawing 17 & 18. |
||