| Date: |
4-7-2008 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Aileron and flap installation |
|
|
I started the day by installing then rigging the right aileron. Then I moved back to the left wing and match drilled the left flap hinge to the wing trailing edge followed by deburring, countersinking and riveting. I finished by match drilling the right flap hinge to the right wing trailing edge. |
||