Date:    2-7-2007
Number of Hours:    1.75
Brief Description:    Left wing tank sealing
I pressure checked the right wing tank once more only to find the BNC connector still leaking. I opened the tank access panel and added still more sealant to the connector. I finished dabbing the rivet shop heads on the left tank. I finished up by clecoeing on the left wing lower skin in preparation for match drilling.