| Date: |
2-7-2007 |
|
| Number of Hours: |
1.75 |
|
| Brief Description: |
Left wing tank sealing |
|
|
I pressure checked the right wing tank once more only to find the BNC connector still leaking. I opened the tank access panel and added still more sealant to the connector. I finished dabbing the rivet shop heads on the left tank. I finished up by clecoeing on the left wing lower skin in preparation for match drilling. |
||