| Date: |
1-3-2007 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Match drilled left wing leading edge |
|
|
The left wing leading edge and top skin were match drilled to the left wing skeleton. My wife Meta generously donated her time to help move clecoes during the match drilling process. |
||