Date:    11-26-2006
Number of Hours:    4.00
Brief Description:    Cleaning, abrading and alodining
With all flap match drilling, deburring and edge finishing completed I cleaned, abraded and alodined both left and right flap components as well as the lower wing access panels and the right wing leading edge joint plate rib.