| Date: |
11-26-2006 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Cleaning, abrading and alodining |
|
|
With all flap match drilling, deburring and edge finishing completed I cleaned, abraded and alodined both left and right flap components as well as the lower wing access panels and the right wing leading edge joint plate rib. |
||