| Date: |
11-17-2006 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Dimpling of right aft spar, nut plates and rivetin |
|
|
I started by dimpling the right wing aft spar flange. Then I installed the nut plates on the fuel tank to leading edge joint plate, see image 1. After that I installed the nut plates on the fuel tank attach Z brackets, see image 2. Finally I fully assembled the leading edge and began riveting the skin to the ribs, see image 3. I got about half of the leading edge riveting done. |
||