Picking up where I left off yesterday I drilled the next two bulkheads forward of the aft most bulkhead, deburred the holes, installed grommets and routed the aft nav and strobe light wires through all the bulkheads. Then I reinstalled the horizontal to vertical stabilizer fairing, sanded the reglassing and filling I had done last week and drilled the retaining screw holes to final size. Next I removed the fairing and both stabilizers and drilled, deburred and riveted the fairing retaining screw nut plates to the stabilizers.
|