| Date: |
8-16-2009 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Elevator trim wiring & stab fairing installation |
|
|
Today I bolted on the horizontal stabilizer one more time to finalize the elevator trim wiring from the trim servo to the aft fuselage bulkhead disconnect. I added snap bushings for the wiring pass through, cut the wires to length, added heat shrink for extra chafe protection and then crimped on D-sub connector pins. Then I bolted on the vertical stabilizer and began the fitting of the upper and lower stabilizer fairings. |
||