| Date: |
7-2-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Floor match drilling. |
|
|
Install floor and baggage area and match drilled with a little help from Ron. Assembled and placed foot wells. Had to order a few drill bits for the next step. |
||