| Date: |
11-1-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Vertical Stabilizer |
|
|
Clecoed spar doubler to main spar. Back drilled hinges where needed and match drilled #30 all existing holes then clecoad all hinges in place. |
||