| Date: |
9-20-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Right elevator. Counterweight/ Tip |
|
|
Grinded down tip and fitted to elevator . Took as little lead off as possible on the weight enough for the tip to fit tightly. I will be fiberglassing over this at some time. |
||