Date:    9-20-2008
Number of Hours:    2.00
Brief Description:    Right elevator. Counterweight/ Tip
Grinded down tip and fitted to elevator . Took as little lead off as possible on the weight enough for the tip to fit tightly. I will be fiberglassing over this at some time.