| Date: |
5-22-2008 |
|
| Number of Hours: |
12.00 |
|
| Brief Description: |
Horizontal stabilizer, Left elevator |
|
|
6 hours on the Horiz. stab. 6 hours on the left elevator. Finished riveting skin on H.S. Placed platenuts for electric trim access panel. Riveted skin on left elevator, starting to look like something . Rolled and blind riveted leading edge on left elevator with pneumatic rivet gun , I might have to get one of these. |
||