| Date: |
5-19-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Wing wiring prep. |
|
|
Drilled holes in ribs for snap bushings and after deburring the holes and inserting rhe bushings I ran a couple of strings through each wing. I taped a 12' or so drill bit to the string which helped alot with the root ribs so close and unaccessable. Once I get my lights and other wired things installed this should be a breeze. |
||