Date:    4-9-2011
Number of Hours:    1.00
Brief Description:    Pushrod , Bellcrank to stick
Cut the 1.125" pushrods to specs and primed the inside . The inside was prepped with a 3m scotchbrite pad that I pushed through with a dowl a few times. I will powdercoat the final assembly's once they are fully completed.