| Date: |
4-9-2011 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Pushrod , Bellcrank to stick |
|
|
Cut the 1.125" pushrods to specs and primed the inside . The inside was prepped with a 3m scotchbrite pad that I pushed through with a dowl a few times. I will powdercoat the final assembly's once they are fully completed. |
||