| Date: |
10-2-2014 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Right top main skin prep |
|
|
The right top main wing skins (2) were deburred, the edges were prepped and then the skins were dimpled. There is also a wing walk area doubler that was also prepped and dimpled. |
||