Date:    8-28-2014
Number of Hours:    8.00
Brief Description:    Sealing the left tank part 3
Once the proseal has time to partially set the tank ribs were riveted in place. A dab of proseal was placed into the dimple before inserting the rivet. Then the rivet was set. This process is very tedious and time consuming. Once all the ribs were riveted each shop head received a blob of proseal.