Date:    8-27-2014
Number of Hours:    6.00
Brief Description:    Sealing the left tank part 2
The next part to be sealed were the internal tank ribs. Saving the outboard/inboard ribs for last will allow better access for installing the capacitive plates and vent line. While the tank was assembled in the cradle, each internal rib was taken out and a layer of proseal was added to the rib flange. It was carefully lowered into place and clecoed in. Then a filet was formed with the proseal that was squeezed out. Not a lot of pics were taken beacase there was proseal everywhere lol