| Date: |
8-26-2014 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Sealing the left tank part 1 |
|
|
All the surfaces where proseal would be applied were scuffed then cleaned with MKE. The stiffeners were the first parts of the tanks to be sealed and riveted. A layer of proseal was applied to eache stiffener and then backriveted into place. The fuel cap and drain valve were also sealed and riveted into place. A filet was formed around each stiffener/gas cap/drain valve where the proseal was squeezed out. Then a glob of proseal was put over each shop head. |
||