| Date: |
8-15-2014 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Fabricating all the parts in the inboard fuel bay |
|
|
Today I repeated everything for the right fuel bay. I also was able to match drill the flange for the drain valves for each tank as well as the gas cap flanges for both tanks. |
||