| Date: |
3-2-2014 |
|
| Number of Hours: |
7.50 |
|
| Brief Description: |
Riveting the left horizontal stab |
|
|
Now came time to start attacing the skin. First, the HS-707 rib was riveted to the top portion of the skin. HS-706 and HS-708 were clecoed in place and then HS-708 was clecoed to the front spar. Once this was done, HS-707 was riveted to the bottom side of the skin. The front spar was put into place with the ribs and HS-707, HS-708 was blind riveted to the front spar. HS-702 was riveted to HS-706. HS-702 and HS-708 was riveted to HS-801PP. |
||