| Date: |
6-3-2020 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Stiffeners prep |
|
|
About two hours finishing off all the right elevator stiffeners. Lots of filing and sanding but job done. Next to scotchbrite the stiffeners and inside of the skin before dimpling time. Looking ahead the right elevator looks a lot more simple than the left elevator as the left elevator has the trim tab and electric trim to deal with plus apparently lots of builders have to reorder the trim tab because of builder mistakes. |
||