Date:    7-19-2011
Number of Hours:    3.00
Brief Description:    Received fuselage shipment
Looked again at the left elevator RTV issue. Fabricated a tube to get the silicone down in there.

Fuselage arrived at Baytown Ace Machine today. Was able to use a worker to get it with the forklift and load it in the trailor.