Date:    7-6-2011
Number of Hours:    6.00
Brief Description:    right elevator, trim tab
Riveted the skin of the right elevator onto the skeleton. Studied the installation of the servo motor for the left elevator. Fabricated bending blocks and bent the tabs on the trim tab.