Date:    1-2-2009
Number of Hours:    3.00
Brief Description:    Right side skin (cont)
Finished drilling/clecoing bottom holes. Verified HT frame alignment and square to upper longeron, drilled/clecoed right side skin to frames.

Cut 'L' angle diagonal piece. Then re-cut both diagonals to get them right side up. Drilled/clecoed in place.

Searched for piece 6B3-6. Looked 'everywhere' twice. Finally found that it was wrapped up with the firewall....the big piece hiding the small...

Quit for the day.