| Date: |
8-25-2008 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Right wing - baggage locker |
|
|
Attached dzus springs to baggage door frame pieces. Used dzus fastener to help align. Then drilled and clecoed one end before drilling second hole. Riveted springs in place. |
||