| Date: |
3-7-2020 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
TAILCONE Aft deck drilling |
|
|
After checking alignement and position of all parts we positioned the clamps to keep the aft deck in position we we started drilling F-1010A HS attachment angle and the top side of the longerons. Clecoing as we proceed. Marchdrilling all the other pars (stop, doublers), Matchdrilled the #12 holes in the longerons. |
||