Date:    2-8-2020
Number of Hours:    0.50
Brief Description:    TAILCONE Bellcrank ribs matchdrilling
Assembly of the F-1006 Bulkhead to the left and right skins and to the bellcrank ribs.Final drill all holes with #30 drill bit.