| Date: |
2-8-2020 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
TAILCONE Bellcrank ribs matchdrilling |
|
|
Assembly of the F-1006 Bulkhead to the left and right skins and to the bellcrank ribs.Final drill all holes with #30 drill bit. |
||