| Date: |
2-1-2020 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
TAILCONE Longeron Preparation and Bending |
|
|
Cut to length the two longerons. Drilled two 1/4" holes and removed area to create the notches for the Horizontal Stabilizer attachment bars. Bending of the longerons has been done by Lucio with my support. |
||