| Date: |
4-27-2020 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
TAILCONE matchdrill longerons |
|
|
checked depth of the countersink using scrap skin with @40 dimples. adiusted CSK cage Drilled the two longerons after clamping to the table. in two occasion the csk stop didnt work properly resulting in a sligthly enlarged countersink. Reason is the stop-nut becoming loose with vibration. |
||