Date:    4-27-2020
Number of Hours:    2.00
Brief Description:    TAILCONE matchdrill longerons
checked depth of the countersink using scrap skin with @40 dimples.
adiusted CSK cage
Drilled the two longerons after clamping to the table.
in two occasion the csk stop didnt work properly resulting in a sligthly enlarged countersink. Reason is the stop-nut becoming loose with vibration.