| Date: |
11-23-2019 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
HS final drill structure |
|
|
asembled stringers to web. final drilled #30 the 5 outboard holes on each stringer. final drilled all #30 holes in commn with the spar, stringer, caps. |
||