| Date: |
6-2-2019 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
VS assemble and matchdrill |
|
|
pre-assemble with cleco all the structure and final drill Vertical Stabilizer structure using #30 dril Prepare nose ribs trimming the corner as indicated in the horizontal stabilizer section to prevent dents in the skin during final assembly |
||