Date:    6-2-2019
Number of Hours:    1.00
Brief Description:    VS assemble and matchdrill
pre-assemble with cleco all the structure and final drill Vertical Stabilizer structure using #30 dril

Prepare nose ribs trimming the corner as indicated in the horizontal stabilizer section to prevent dents in the skin during final assembly