Date:    11-14-2013
Number of Hours:    0.50
Brief Description:    Bottom skins #7
Lauren came in and gave me a quick hand to shoot some rivets after I back riveted the stiffener on.

The proseal was mixed and added to where the cooling ramp meets the skins and the firewall. The blind rivets that were used left a bit of a stem behind. I will have to scotchbrite those down.

Took us about 10 minutes to buck the rivets.

I'll come back at a later date and proseal the sides of the cooling ramp in