| Date: |
11-14-2013 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Bottom skins #7 |
|
|
Lauren came in and gave me a quick hand to shoot some rivets after I back riveted the stiffener on. The proseal was mixed and added to where the cooling ramp meets the skins and the firewall. The blind rivets that were used left a bit of a stem behind. I will have to scotchbrite those down. Took us about 10 minutes to buck the rivets. I'll come back at a later date and proseal the sides of the cooling ramp in |
||