| Date: |
3-26-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Aft top skin and aft deck |
|
|
Aft top skin clecoed into position. Aft deck centred, clamped and clecoed into position. The F-812B-1 clecoed into position and the outboard holes drilled to #12 and bolts temporarily installed. Areas to be removed for the stab bars and the F-812 bulkhead assembly marked. All holes final drileld to #30 and #40. Skin is flush to the longerons. |
||