Date:    3-23-2013
Number of Hours:    2.00
Brief Description:    Upper longeron and skin drilling #4
Matched drilled all the #40 holes in the F-820 forward side skins

Final drilled the #19 holes on both sides of the gear box assemblies for the structural screws.

Final drilled all the #30 holes in the F-820 forward side skins.