| Date: |
3-23-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Upper longeron and skin drilling #4 |
|
|
Matched drilled all the #40 holes in the F-820 forward side skins Final drilled the #19 holes on both sides of the gear box assemblies for the structural screws. Final drilled all the #30 holes in the F-820 forward side skins. |
||