| Date: |
3-18-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Right lower and auxilliary longeron drilling |
|
|
Same as the left lower and auxilliary longeron. Didn't go through that many bits this time, but these are tough holes going through the steel. My care package arrived from Van's today. My Andair valve and the rear seat throttle kit. |
||