Date:    3-9-2013
Number of Hours:    1.50
Brief Description:    Tailcone bulkheads #4
Clecoed the F-808 bulkheads, final drilled the common holes

Flanges straightened, deburred, scuffed, cleaned and primed.

Riveted on the left and right bulkheads together and added the snap bushings.

Clecoed the F-807 bulkheads, removed the identified areas as per the drawing, Final drilled all the required holes.

Dimpled the required #40 and #30 holes on the forward side.

Scuffed, cleaned, and primed.

Riveted together and added teh snap bushings.

This will be my last entry for the week. Off to Florida tomorrow.

By the time I get back, I expect my Andair fuel valve and rear seat throttle to be here, and I will be picking up my fairings for the grove gear and tail section from Bob.