Date:    1-23-2013
Number of Hours:    1.00
Brief Description:    Right wing tip install #5
Scotchbrited and cleaned up the reinforcement strips and rough up the area of teh fivreglass for bonding.

Brought the work into the warm basement where the epoxy can setup properly. I mixed up the resin and hardener, mixed it well and then used a foam brush to apply the epoxy to the roughed up fibreglass surface. The strips were put in place with clecoes, the I clamped it all down and removed the cleoces.

Repeated the process for the the other side as well.

Once cured, I'll rivet on the nutplates.