| Date: |
10-25-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Right elevator #5 |
|
|
The rolling of the leading edges. This part I did not like and I'm not entirely happy with. I used a 3/4 inch steel pipe, and used the vice grip method and lots of gorilla tape. After rolling both sides, I attached the the skins together. I had slight pillowing on the middle piece. Took it apart and tried it again. At the end of it, the right elevator wasn't bad, but did have some pillowing. I tried to uses to JB weld and clamps to bring the pillowing out, but no luck. I'll be removing the rivets and re-rolling the leading edge in the future. |
||