| Date: |
5-31-2012 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Left wing leading edge part #13 |
|
|
Second entry of the day. After leak testing the tank, I placed it on the spar and screwed every second hole. The joint on the top of the wing is excellent. The bottom at the leading edge joint will need a slight adjustment, but overall much better than the right wing initially.. Also received a couple of things in the mail today. Two infinity grips Crows seatbelts Dynon AP74. |
||