Date:    6-4-2010
Number of Hours:    2.00
Brief Description:    Construction continues on the right elevator
After the stiffeners were back riveted on the right elevator, the trailing edge was bent in the home made bender. A couple of bending stages and the required bend was achieved so that the leading edges sat on the spar.

Onto the sub structure.