| Date: |
6-9-2010 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Riveting the right elevator part 3 |
|
|
Riveted the E-713 to the E-701, two rivets on the top and bottom. Substructure clecoed in place until the MDRA inspection is completed. That's it for the right elevator...for now. |
||