Date:    6-9-2010
Number of Hours:    1.00
Brief Description:    Riveting the right elevator part 3
Riveted the E-713 to the E-701, two rivets on the top and bottom.

Substructure clecoed in place until the MDRA inspection is completed.

That's it for the right elevator...for now.