Date:    6-6-2010
Number of Hours:    2.00
Brief Description:    Counter weight work
Placed the E-714 counterweight on the forward end of the E-703 and E-704 as per the diagram. Clecoed the E-713 skin to the E-703/E-704 over the E-714.

Used the two holes on the forward face of the E-713 as a guide to drill the lead. Started with smaller drill sizes to the final size of #12....Need to use Boelube here.

Machine counter sunk the E-714 and dimpled the E-713.

The screw head sits nice and flush into the counterweight.