Date:    6-5-2010
Number of Hours:    3.00
Brief Description:    Substructure for the right elevator
Clecoed the E-610PP & E-611PP to the E-702 spar with the platenuts, where the where final drilled.

Prepared the E-703 rib and E-704 counterbalance rib where they were deburred, drilled and fluted.

Clecoed the E-709 to the E-702, drilled and deburred.

Clecoed the E-701-R to the understructure and drilled.

The WD-605-1-R was clecoed and drilled to the E-702 and E-709.

E-701-R skin final drilled to sub assembly.

All parts were then removed and primed.