| Date: |
1-21-2019 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Engine Controls installation |
|
|
Installed the Cabin Heat, Mixture, Prop, and Throttle cables between the instrument panel and the firewall. I will wait to seal them at the firewall until after they are connected to the engine. |
||