| Date: |
8-23-2007 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Cabin Frame Construction Completed |
|
|
- Filed the ends of the cabin frame assembly and polished to even them out as the straps had been a little bit longer than needed. - Disassembled cabin frame and went through the various countersinking, deburring, etc, prep. - Primed the interior of the channels, both sides of the straps and the joint plates. - Reassembled the frame and riveted together using the squeezer and blind riveter. |
||