Date:    8-23-2007
Number of Hours:    9.00
Brief Description:    Cabin Frame Construction Completed
- Filed the ends of the cabin frame assembly and polished to even them out as the straps had been a little bit longer than needed. - Disassembled cabin frame and went through the various countersinking, deburring, etc, prep. - Primed the interior of the channels, both sides of the straps and the joint plates. - Reassembled the frame and riveted together using the squeezer and blind riveter.